# Sarathi-Serve schedules chunked prefill alongside decoding

Sarathi-Serve schedules chunked prefill alongside decoding is recorded in the AI Engineering timeline under 2024-03-04.

- Date — 2024-03-04
- Timeline — AI Engineering

## Outgoing relationships

- about — [Continuous batching](/wiki/continuous-batching) · Event subject
- about — [Continuous batching](/wiki/continuous-batching) · Recorded
- about — [Model serving](/wiki/model-serving) · Event subject
- about — [Model serving](/wiki/model-serving) · Recorded

## Incoming relationships



## References

https://chronoscope.hopperlabs.ai/#/ai-engineering/x/2024-sarathi-serve-schedules-chunked-prefill-alongside-decoding
